Donnelly River Shelters Upgrade
6 May 2019
The Donnelly River shelters upgrade was completed on 3rd of May by Bibbulmun Track Foundation Support Volunteers.
The team stripped and de-nailed the old jarrah boards. Oiled, cut and installed all new jarrah boards, both sides. Applied second oil coat to exteriors after installation.
One of the shelters was installed with a cooking bench and transparent roof sheets were replaced with new.
The jarrah floor boards were washed and oiled, thanks to Macca and Donnelly District for supplying the timber preservation oil.